Material Requirement Calculator
Project dimensions se cement, paint, tiles, bricks — kisi bhi material ki required quantity aur cost nikalein.
Project Dimensions
Length (m)
Width (m)
Height / Thickness (m)
Wastage Allowance
Wastage / Buffer
%
Materials
Wastage
Buffer
Buffer
0%
Total Estimated Cost
$0
0 materials
Project Area
0 sq.m
Project Volume
0 cu.m
Bill of Materials
Har material ki required quantity (wastage included) aur estimated cost.
| Material | Basis | Required Qty | Cost |
|---|---|---|---|
| Total Cost | $0 | ||
Formula kaise kaam karta hai
Required Qty = Consumption Rate × (Area ya Volume) × (1 + Wastage%)
- Area = Length × Width — flooring, tiles, paint, plaster jaise materials ke liye
- Volume = Length × Width × Height/Thickness — concrete, sand, cement jaise materials ke liye
- Har material apni Consumption Rate (per sq.m ya per cu.m) use karta hai — jaise "0.4 bags cement per sq.m plaster"
- Wastage Allowance project ke dauran material loss/cutting waste cover karne ke liye add hoti hai (typically 5–10%)
- Cost = Required Quantity × Unit Cost (agar diya gaya ho)
Note: Default consumption rates general estimates hain — actual rates material brand, application method aur surface ke hisaab se vary karte hain. Bara project shuru karne se pehle supplier/contractor se confirm karein.